As a Homeowner am I allowed to do my own installation?

Yes, you must schedule a time to take the OWTS exam at the ECPH office.  The exam is open book. A passing score is required.  ECPH must conduct a pre-site visit, prior to any installation. If it is an engineered design, it will require the final approval of the engineer as well as Elbert County Public Health.      

Show All Answers

1. How do I get a permit to build a new, or repair an on-site wastewater treatment system (OWTS)?
2. Under what conditions must an on-site wastewater treatment system (OWTS) be designed by a Colorado Licensed Professional Engineer?
3. After I have had a NEW septic system installed what are the next steps?
4. As a Homeowner am I allowed to do my own installation?
5. How do I get a Use Permit?
6. I am selling my property and need to get my waste water system certified. What should I do?
7. What is the minimum lot size for an on-site wastewater treatment system (OWTS)?
8. How often do I need to pump my septic tank?
9. Will I be able to irrigate or have horses where my Soil Treatment Area (STA) is located?
10. Can I install a bathroom in a garage, barn, etc., and connect it to my existing on-site wastewater treatment system (OWTS)?
11. I am unsure where my on-site waste-water treatment system (OWTS) is located. Do you have records of my system?
12. I accidentally damaged some components of my septic system. Who should I call to inspect and repair the damage? Do I need a permit?